Contents
How do you unclip a project base point in Revit 2021?
You cannot delete the project base point. Project North defines the Y axis of the project base point. To ensure that the project base point does not move inadvertently, you can pin it by selecting the point and clicking Modify tab Modify panel (Pin).17 fév. 2021
What is the project base point in Revit?
The project base point defines the origin (0,0,0) of the project coordinate system. Use the project base point as a reference point for measurements across the site. The survey point identifies a real-world location near the model, such as a corner of the project site or the intersection of 2 property lines.7 mai 2020
How do you hide a project base point in Revit?
To temporarily display the project base point and the survey point in a view, on the View Control Bar click (Reveal Hidden Elements).7 mai 2020
What are the 3 points in Revit?
There are 3 different origin points in a Revit project: the Project Base Point, the Survey Point and the secret Internal Origin.6 jui. 2018
What is a project point?
A project point cloud presents the project’s scan data in an optimized spatial structure for fast visualization of large amounts of scan points. Scan points are loaded and visualized on demand based on the camera position and point visibility, allowing users to view all scans of a scan project at once.2 juil. 2018
How do you find project coordinates in Revit?
1. Optional: Display the project base point and the survey point in the current view.
2. Click Manage tab Project Location panel Coordinates drop-down (Specify Coordinates at Point).
3. Place the cursor on a reference point of the model.
4. Click the reference.
5. Enter values for the selected reference.
6. Click OK.
What is survey base point?
The survey point represents a known point in the physical world, such as a geodetic survey marker. The survey point is used to correctly orient the building geometry in another coordinate system, such as the coordinate system used in a civil engineering application.
How do you move a project base point in Revit without moving a building?
1. In the site plan view or another view that displays the project base point, select the project base point.
2. Drag the project base point to the desired location.
3. Optional: To ensure that the project base point does not move inadvertently, pin it in place by clicking Modify tab Modify panel (Pin).
What is the method to georeference a Revit file?
Revit 2018 now has the option to use the Geo-Referenced data from a CAD file that was used to Acquire Coordinate data. When you link and position a Geo-Referenced CAD file, you use the Acquire Coordinates feature in Revit to share coordinate system data between the Revit and CAD file.12 déc. 2017
How do you change the ground level in Revit?
1. Select the ground level line and specify elevation:
2. Ground level still says 0. Select the ground level line and change the type to Shared Datum:
3. Ground level now shows the Shared Datum levels:
Can you move the internal origin in Revit?
The internal origin is the starting point for the internal coordinate system, which provides the basis for positioning all elements in the model. Note: The location of the internal origin never moves.22 juil. 2021
How do you move project base point more than 10 miles?
1. In 2020.2. 1 and earlier: Un-clip base point and use Relocate Project to move project base point.
2. In 2020.2. 2 and later: Go to Manage > Coordinates > Specify Coordinates at Point.
How do you specify coordinates?
Specify the X-, Y- and Z-coordinates separated by commas, for example 0,0,0. Specify subsequent coordinates to complete the command, for example 3.5,8.2,6.7. To place a point in the XY-plane (Z coordinate is zero), omit the Z-coordinate. For example, type 3.5,8.2.
How do you reset coordinates in Revit?
Open the host model whose coordinates you want to reset. Click Manage tab Project Location panel Coordinates drop-down (Reset Shared Coordinates). Click to close the message indicating the shared coordinates have been reset.20 mai 2021