Contents
When you combine multiple models and files in a single project, use shared coordinates to establish the positions of the files in relation to each other. A Revit project has internal coordinates for all the elements that compose the model in a project. Those coordinates are known to this project only.28 jui. 2021
1. Specify coordinates for the Revit model.
2. Click Insert tab Link panel (Link CAD).
3. In the Link CAD Formats dialog, for Files of type, select DWG Files (*.
4. Navigate to the folder that contains the file to link, and select the file.
5. For Positioning, select Auto – By Shared Coordinates.
How do you enter coordinates in Revit?
1. Optional: Display the project base point and the survey point in the current view.
2. Click Manage tab Project Location panel Coordinates drop-down (Specify Coordinates at Point).
3. Place the cursor on a reference point of the model.
4. Click the reference.
5. Enter values for the selected reference.
6. Click OK.
In the Revit site model, copy and paste the building instance. Adjust the position, both in plan view and in elevation. Now, you have to create a new Shared Site. Click on the Shared Site button in the instance properties of the linked model.17 oct. 2019
1. Open the host model whose coordinates you want to reset.
2. Click Manage tab Project Location panel Coordinates drop-down (Reset Shared Coordinates).
3. Click to close the message indicating the shared coordinates have been reset.
What is the difference between overlay and attachment in Revit?
When linking a Revit model, Revit gives two options: Attach or Overlay. This defines the visibility of nested models (models linked to the link) in the main model. Attachment loads nested linked models and displays them in the project, Overlay only loads the linked model (and not the ones linked into it).23 août 2018
How do I relocate a project in Revit?
1. Click Manage tab Project Location panel Position drop-down (Relocate Project). You use the tool just like the Move tool.
2. Move the project graphically in the view. See Move Elements with the Move Tool.
Shared parameters are definitions of parameters that you can add to families or projects. Shared parameter definitions are stored in a file independent of any family file or Revit project; this allows you to access the file from different families or projects.7 mai 2020
How do you create a project base point in Revit?
1. Click View tab > Graphics panel > Visibility/Graphics.
2. On the Model Categories tab of the Visibility/Graphics dialog, scroll down to Site.
3. To display the project base point, select Project Base Point.
4. To display the survey point, select Survey Point.
What are the 3 points in Revit?
There are 3 different origin points in a Revit project: the Project Base Point, the Survey Point and the secret Internal Origin.6 jui. 2018
What is the method to georeference a Revit file?
Revit 2018 now has the option to use the Geo-Referenced data from a CAD file that was used to Acquire Coordinate data. When you link and position a Geo-Referenced CAD file, you use the Acquire Coordinates feature in Revit to share coordinate system data between the Revit and CAD file.12 déc. 2017
How do you plot a lot bearing in Revit?
What is acquire coordinates in Revit?
Acquire Coordinates. When you acquire coordinates from a linked Revit project, the shared coordinates of the linked project become the shared coordinates of the host project, based on the position of the linked project instance in the host project. There is no change to the host project’s internal coordinates.
How do you link topography in Revit?
1. Specify coordinates for the building model.
2. Open a plan view or a 3D view for the building model.
3. Click Insert tab Link panel (Link Topography).
4. In the Link Topography dialog, navigate to the topography.
5. Select the desired topography, and click Link.
How do you move a project base point in Revit without moving a building?
1. In the site plan view or another view that displays the project base point, select the project base point.
2. Drag the project base point to the desired location.
3. Optional: To ensure that the project base point does not move inadvertently, pin it in place by clicking Modify tab Modify panel (Pin).