Contents
What is coordinates in Revit?
Revit uses 2 coordinate systems: a survey coordinate system and a project coordinate system. … It uses a selected point within the property boundary or within the extents of the project as a reference for measuring distances and positioning objects in relation to the model.22 juil. 2021
1. Open the host model.
2. Link the file from which you want to acquire coordinates. The link can be topography, a DWG or DWF file, or a Revit model.
3. Click Manage tab Project Location panel Coordinates drop-down (Acquire Coordinates).
4. Place the cursor on a link, and click.
1. Optional: Display the project base point and the survey point in the current view.
2. Click Manage tab Project Location panel Coordinates drop-down (Specify Coordinates at Point).
3. Place the cursor on a reference point of the model.
4. Click the reference.
5. Enter values for the selected reference.
6. Click OK.
1. Open the host model whose coordinates you want to reset.
2. Click Manage tab Project Location panel Coordinates drop-down (Reset Shared Coordinates).
3. Click to close the message indicating the shared coordinates have been reset.
What are the 3 points in Revit?
There are 3 different origin points in a Revit project: the Project Base Point, the Survey Point and the secret Internal Origin.6 jui. 2018
How do you set coordinates in Revit?
Click on the Manage Tab > Coordinates > Specify Coordinates at a Point. Click on the model line at the known origin point. The Specify Shared Coordinate dialog will open. Enter the coordinate values, the correct datum (Elevation) and the angle to True North.
1. Open the host model whose coordinates you want to share with the linked model.
2. Click Manage tab Project Location panel Coordinates drop-down (Publish Coordinates).
3. Place the cursor on a linked model instance and click.
4. Select a named position from the linked model, and click OK.
How do I get coordinates in Autocad?
1. Click Home tab Utilities panel ID Point. Find.
2. Click the location that you want to identify. The X,Y,Z coordinate values are displayed at the Command prompt. With object snaps turned on, you can select an object and see the coordinates for a feature such as an endpoint, midpoint, or center.
What the option acquire coordinates and publish coordinates do in Revit?
When you acquire coordinates from a linked model or file, the coordinates of the linked model establish the shared coordinate system of the host model. When you publish shared coordinates from a host model to a linked model, the linked model is updated with the new coordinates.13 juil. 2021
How do I relocate a project in Revit?
1. Click Manage tab Project Location panel Position drop-down (Relocate Project). You use the tool just like the Move tool.
2. Move the project graphically in the view. See Move Elements with the Move Tool.
On the eTransmit panel of the Add-Ins tab, click Transmit a model. Choose the model(s) to transmit: Click Browse Model, and navigate to the location of the Revit model you want to transmit. Click Browse folders, and navigate to the folder that contains the Revit models you want to transmit.23 avr. 2018
Click Collaborate tab Manage Collaboration panel (Worksets). Note: If you have installed the Revit Cloud Worksharing add-on, then: Click Collaborate tab Manage Collaboration panel Collaborate. In the Collaborate dialog, select Collaborate within your network and click OK.28 jui. 2021
How do I move a linked model in Revit?
To reposition the linked model, select it, right-click, and click Reposition to Project Base Point.7 mai 2020
How do you move a project base point in Revit without moving a building?
1. In the site plan view or another view that displays the project base point, select the project base point.
2. Drag the project base point to the desired location.
3. Optional: To ensure that the project base point does not move inadvertently, pin it in place by clicking Modify tab Modify panel (Pin).